Helio Urban Development
  • Home
  • Contact
    • Get My Quote
  • Home
  • Contact
    • Get My Quote
Thumbnail for: Intergenerational Homes: Two Primary Suites Under One Roof in NS

Intergenerational Homes: Two Primary Suites Under One Roof in NS

Thumbnail for: Co‑Living Suites: Legal Layouts and Market Fit in Halifax

Co‑Living Suites: Legal Layouts and Market Fit in Halifax

Thumbnail for: Three‑Storey Walk‑Up Apartments: Sweet‑Spot Configurations for HRM

Three‑Storey Walk‑Up Apartments: Sweet‑Spot Configurations for HRM

Thumbnail for: Stacked Townhouses in HRM: By‑Right Scenarios and Model Floor Plans

Stacked Townhouses in HRM: By‑Right Scenarios and Model Floor Plans

Thumbnail for: Frost‑Protected Shallow Foundations in Nova Scotia: Design and Code Notes

Frost‑Protected Shallow Foundations in Nova Scotia: Design and Code Notes

Thumbnail for: Radon‑Ready New Homes in Nova Scotia: Rough‑Ins and Testing Plan

Radon‑Ready New Homes in Nova Scotia: Rough‑Ins and Testing Plan

Thumbnail for: Exterior Doors and Windows for Coastal Exposure: DP Ratings, Hardware, and Maintenance

Exterior Doors and Windows for Coastal Exposure: DP Ratings, Hardware, and Maintenance

Thumbnail for: Soundproofing Floors and Party Walls: Assemblies That Balance Cost and Performance

Soundproofing Floors and Party Walls: Assemblies That Balance Cost and Performance

Thumbnail for: Air Barriers and Vapour Control in Maritime Climates: Avoiding Condensation Failures

Air Barriers and Vapour Control in Maritime Climates: Avoiding Condensation Failures

Thumbnail for: Roofing Systems for Atlantic Wind: Nailing Schedules, Underlayments, and Warranties

Roofing Systems for Atlantic Wind: Nailing Schedules, Underlayments, and Warranties

Thumbnail for: Heat Pumps in New Construction: Sizing, Distribution, and Cold‑Climate Models for NS

Heat Pumps in New Construction: Sizing, Distribution, and Cold‑Climate Models for NS

Thumbnail for: Advanced Framing vs Conventional: Material Savings and Thermal Bridges in NS

Advanced Framing vs Conventional: Material Savings and Thermal Bridges in NS

Thumbnail for: Fire‑Rated Assemblies for Small Multi‑Unit Buildings: Practical Details That Pass

Fire‑Rated Assemblies for Small Multi‑Unit Buildings: Practical Details That Pass

Thumbnail for: Part 9 vs Part 3: Which Building Code Path Applies to Your Project in NS?

Part 9 vs Part 3: Which Building Code Path Applies to Your Project in NS?

Thumbnail for: Garbage, Recycling, and Bike Storage: Site Planning That Passes Review in HRM

Garbage, Recycling, and Bike Storage: Site Planning That Passes Review in HRM

Submission Successful

The form has been successfully submitted.

  • Back to site
© 2025 

Helio Urban Development. All Rights Reserved.

    Cookie 🍪
    We use cookies to improve your experience on our site.